Renovation and Erection Projects
BHEL, Noida
(UPRVUNL, Aligarh)
-Refurbishment, Renovation, Modernization &Uprating of 110MW, Unit-7 at Harduaganj TPS
-Erection, Testing commissioning, PG Test, PostCommissioning trial run and hand over
BHEL, Nagpur
(MPPGCL, Sarni)
Erection and Commissioning of Rotary AirPre-heaters and Louver Dampers U#7, Satpura TPS
Duct Modification Upgradation of BurnerManagement System in HRSG 1 & 2
Hindalco Industries Ltd.
(Dahej)
1. Fabrication, Dismantling and erection of WHRSB Drag chain conveyor
2. Replacement & modification of Water Wall, Spring Hammer and compensator band
3. Fabrication, dismantling and Erection of Gooseneck Duct with LSM Metallic Bellow
Lanxess (India) Pvt. Ltd.
(Nagda)
Erection and Commissioning of Waste Heat Boiler
Lanxess (India) Pvt. Ltd.
(Nagda)
Fabrication, Erection & Commissioning of Main Steam Line
Birla Cellulosic
Fibre Division
Fabrication, Laying, Erection, Testing andCommissioning of High Pressure Pipe Line.( Including Scaffolding, Insulation andother associated requirements)
Installation and Commissioning of Gas to GasHeat Exchanger (GGH)
Replacement of Super Heater Header(OD558.8X110MM & OD457.2X110MM) Unit-6,TROMBAY THERMAL POWER
Replacement of Super Heater Header(OD558.8X110MM & OD457.2X110MM) Unit-5