The relationship between Tata Power and UHPL started in the year 1994 in Bombay (now known as Mumbai). The job was of overhauling of one of the units in Trombay. Needless to say it was a gleaming success story. Since then we have done over 50 projects with Tata Power in almost all the locations of their installed units ranging from 100MW, 250MW (gas and coal) and 500 MW.We have been awarded by this reputable company on several occasion and were one of the handful of companies invited to attend a conference for the entities associated with Tata group.
In the year 1978, replacement of economizer, APH block and convection Super heater was considered to be a challenging and unprecedented job. We took up this job in NTPC Badarpur (Delhi) for a 100 MW unit. Our work was appreciated and that helped us form a long and healthy associated with this Indian Maharatna company. From that time till now we have worked in over 100 NTPC projects of all capacities (100, 210, and 500).
The foundation of UHPL was laid at the site of this Navratana company. The first and foremost project we completed was the Overhauling of two 50MW units in Patratu. From the break we got at BHEL, we made it our purpose to maintain this connection and rapport. Till date we have done over 100 projects with BHEL ranging in diverse capacities of 50 MW, 100(110)MW, 200(210)MW and 500MW.
In the year 1978, replacement of economizer, APH block and convection Super heater was considered to be a challenging and unprecedented job. We took up this job in NTPC Badarpur (Delhi) for a 100 MW unit. Our work was appreciated and that helped us form a long and healthy associated with this Indian Maharatna company. From that time till now we have worked in over 100 NTPC projects of all capacities (100, 210, and 500).